Mufindi Social Hall

During 2006 and 2007 CCM is building a new district hall for Mufindi. Sao Hill Industries and GRL were requested to construct the roof for the new building. The 14 m roof span is the largest wooden roof ever built by SHI, and represents an innovation in the use of local, renewable building materials.

The direct cost of the roof, including timber, corrugated iron sheets, other material and labour was TSh 15 mn. With transport and administration, the total costs of the contribution are TSh 20 mn (US$16,000).